Offshore Structures

Topside Installation

SeaMax Corporation was contracted to design for topside installation of production riser bolster – transfer decks. A structural analysis and design of the transfer decks which are installed on top of the electrical and hose hang-off frames for the Papa Tera TLP-P61 interface.The analysis also addresses the structural integrity of the electrical and hose hang-off frames and their tie-down weld connections to the TLP main deck.


hangoff frame-7

TENDER ASSIST VESSEL – INTERFACING WITH TENSION LEG PLATFORM

hangoff frame-6
ess4
ess3
hangoff frame-8